Illustration: OS Power modular data center assembly shop

Manufacturing

A plant building data centers since 1999

Modules, power equipment, busways and engineering systems are produced by the OS Power partner plant in China. Full cycle: development, production, installation and operation.

since 1999

in the data center infrastructure market

2,000+

projects

400+

patents and software registrations

270,000 m²

of production space

Partner plant data as of 10.2026.

Manufacturing

How the plant works

Full cycle

Development, process engineering, lean production and automation in one company.

Equipment

Bending and welding robots, automated warehouse, laser cutting, CNC machines.

Quality control

A dedicated quality department and an intelligent inspection system from raw materials to shipment with full traceability.

R&D

5 development platforms, participation in more than 20 national and industry standards, 3-12% of revenue spent on R&D.

Digital design

Model first, steel second

Every module goes through a full digital cycle before manufacturing starts: fewer changes on site and a shorter schedule.

BIM model of all systems

A 3D model of cooling, water, electrical and structural systems; fabrication drawings are generated from it automatically.

PUE, WUE and CUE calculation

Energy efficiency, water use and carbon footprint are calculated before manufacturing; airflow in the hall is simulated.

Site survey

Laser and AR scanning of existing buildings and sites for accurate placement of modules and routes.

Traceability

Pipes are CNC-cut from the model; every piece carries a tag with installation data. Load, strength and lifting calculations are part of the documentation.

Certificates

Certifications

YearDocument
2019-2024six years in a row among the top three data center builders in China according to the national data center industry association (CDCC)
2022-2024national project quality award three years in a row
licencesClass A general contractor for mechanical and electrical works; Class A contractor for low-voltage and intelligent systems
ISOISO 9001, ISO 14001, OHSAS 18001
2024TUV Rheinland certification
2024China Compulsory Certification (CCC)
2024certificate of conformity for supplies to Nigeria
2021, 2025energy management system
2010-2016quality and environmental management systems
EAEUEAEU conformity assessment (TR CU), applicant - the Russian company of the group

Visit

Visit the plant

  • We will show the production of modules and power equipment.
  • We will run factory acceptance tests of your module in your presence.
  • We will arrange visits to operating sites.

Request

Tell us about your site

IT capacity and rack type, redundancy and autonomy requirements, location and climate, availability of a grid connection, target launch date. Within a week we will prepare a concept, an equipment list and a schedule.

Add details: name, country, file