Solid-state transformers and 800 V DC

Why AI data centers are moving away from the 50 Hz transformer, what this brings and when the technology will be ready for volume projects.

What an SST is

A solid-state transformer (SST) replaces the conventional 50 Hz transformer with silicon carbide power electronics. It takes 10-35 kV grid voltage, converts it at high frequency and delivers 800 V direct current straight to the hall bus. Instead of a bulky copper core, the work is done by a compact high-frequency transformer and several converter stages.

Why it matters for AI data centers

A conventional site power chain has five stages: the grid, a transformer, the main switchboard, a double-conversion UPS and the rack power supplies. Each stage loses energy and takes up space. An accelerator rack draws 120-140 kW, and at that density the copper of 0.4 kV busbars and the size of the electrical room become as much of a constraint as cooling.

Accelerator manufacturers have announced a move to 800 V DC rack power from 2027. High-voltage direct current cuts currents and busbar cross-sections several times over, and an SST naturally delivers exactly this kind of bus.

Power chain today

  1. 10-35 kV grid
  2. 50 Hz transformer
  3. 0.4 kV main switchboard
  4. Double-conversion UPS
  5. Rack power supplies

Power chain tomorrow

  1. 10-35 kV grid
  2. Solid-state transformer
  3. 800 V DC bus
  4. Racks
A solid-state transformer shortens the power chain from five stages to three.

What it delivers

According to estimates from early projects, an SST saves up to half of the electrical room floor space and 3-5 percent of energy compared with a "transformer - UPS" chain. Power electronics are also controllable: they limit the rate of power change, compensate reactive power and work directly with storage on the DC bus.

Where the technology stands today

The first commercial units rated at 2-3 MW appeared in 2025-2026. Safety and grid connection standards are still taking shape, operating experience is measured in months, and the price is still 2-3 times higher than the familiar transformer and UPS combination. For a customer who needs a site this year, this is a technology risk not worth taking on.

The OS Power position

We design sites ready for 800 V DC and SST: we reserve space, cable routes and busbars so that the transition does not require replacing transformers and switchboards. Today we install proven solutions: dry-type transformers, storage on the bus and a supercapacitor buffer in front of the racks. We will offer solid-state transformers to customers once the technology is certified and in volume production.

OS Power storage on the bus already handles some of the tasks SST is being developed for: it shaves peaks, absorbs GPU load pulses and, with a variable load profile, reduces the required grid connection capacity by 20-50 percent (for training clusters the effect is determined by calculation on the hourly load profile). How site power is designed.

Send us your load profile, backup requirements and site conditions

Within a week we will prepare a concept, equipment list and schedule.