Illustration: double-stacked OS Power containerized gensets next to a data center building

Solution

Backup power for data centers and AI data centers

Gensets with data center rating and no engine hour limit, containerized power modules and fuel systems for 48-72 hours. Together with OS Power storage: the battery carries the load while the genset starts and smooths GPU load steps.

Key figures

2.0-2.4 MW

data center rating of units with MTU 20V4000 and Mitsubishi S16R2

manufacturer data

80 × 2.1 MW

largest data center project of the partner plant, Indonesia

manufacturer data

4 per day

units of 1,000 kVA and above at the new plant: 2.5 MW containerized in 3 months

manufacturer data

What a data center requires from generation

Rating without hour limits

For Tier III and IV facilities the genset must carry the load for as long as the grid is down, with no engine hour limit. A standby rating does not guarantee this.

Load acceptance

After grid loss the genset must start and accept the load while UPS and batteries carry the data hall.

Fuel for 48-72 hours

Tanks, transfer pumps, fuel level and quality control, redundant supply lines.

Noise, footprint, schedule

Gensets are installed on roofs, in double-stacked containers, near residential areas; building a generator hall takes a long time.

Solution

How it works

Units with data center rating, synchronization and parallel operation, containerized power modules and storage that covers the start-up time.

  1. Grid availableThe load is fed from the grid, storage is charged, gensets are on hot standby with heating.
  2. Grid lostStorage or UPS instantly picks up the data hall load. Gensets receive the start command.
  3. Gensets on loadAfter synchronization the gensets accept the load in steps, storage smooths transients and GPU load steps.
  4. Grid restoredThe load is transferred back to the grid, gensets run down for cooling and stop, storage recharges.
Data center power flows
Grid 6-35 kV primary source Gensets N+1 backup Main switchboardand ATS IT load and cooling Storage or UPS
  • primary source
  • backup
  • unstable
  • not available

Storage carries the load during genset start-up and synchronization.

Power ratings per ISO 8528

RatingModeApplication
Standby (ESP)grid failure only, average load up to 80 %, up to 500 h per year, no overloadbackup for offices and plants
Prime (PRP)unlimited hours, average load up to 70 %, 10 % overload for no more than 1 h in 12primary source at off-grid sites
Continuous (COP)constant load, unlimited hoursbase load generation
Data center (DCP)unlimited hours at variable data center loadbackup for Tier III and IV data centers

The data center rating is confirmed by the model datasheet. Load acceptance time and load steps are provided on request for a specific model.

See also: Modular data centers · UPS batteries for data centers · Data center power

Projects using this solution

Manufacturer data. Details and references on request after approval by customers.

IndonesiaData centers

Data center, 80 units of 2,100 kW

Scope
about 168 MW of backup capacity; design, supply, installation and commissioning
Result
largest data center project of the partner plant

ChinaData centers

Data center, 12+1 units of 2,750 kVA at 11 kV

Scope
neutral grounding resistor, redundant PLC synchronization, 4 underground tanks of 40,000 l, IP54 containers
Result
75 dBA at 10 m; turnkey with 10-year service

IndonesiaData centers

Data center in two phases: 16 × 2,300, 7 × 1,200 and 400 kW

Scope
enclosed units, underground tanks 6 × 80 and 20 m³
Result
3 million man-hours without accidents

VietnamData centers

Data center, 6 × 2,400 kW and 3 × 2,000 kW

Scope
MTU 20V4000 and Mitsubishi S16R2 engines
Result
installation supervision and commissioning

EthiopiaData centers

Telecom operator data center, 2 × 2,000 kVA

Scope
double-stacked container, remote radiator, 20,000 l tank with automatic fuel transfer
Result
80 dBA at 1 m, to Tier III requirements

AustraliaData centers

Public sector data center, 2,000 kVA

Scope
parallel operation with trigeneration and grid, 4,000 A main switchboard, 2,200 kW load bank
Result
full-load testing on site

Projects

Request

Tell us about your site

Load and load profile, operating mode (backup or primary source), climate, grid availability, noise and fuel requirements. We will reply with a configuration, lead time and proposal.