Product line
From container to campus
We do not tie the customer to a single form factor. The choice depends on capacity, rack density, availability of a building and the timeline. Below is the format ladder with figures.
| Format | IT capacity | Racks | kW per rack | Timeline | When to choose |
|---|---|---|---|---|---|
| 20 ft container | up to 100 kW | up to 8 | air 7-15 | manufacturing from 5 months, installation from 1 day | telecom node, branch office, pilot, site without a server room |
| 40 ft container | 100-300 kW | up to 16 | air 7-15, liquid up to 40 | manufacturing from 5 months, installation from 1 day | regional node, AI pilot, backup site |
| In-building micro-module | 70-400 kW per row | 10-48 | air 7-15, liquid up to 40 | 4-6 months with power in place | a hall with power and sufficient ceiling height is available |
| Prefabricated modular data center | 1-5 MW | 8-40 liquid-cooled + network | liquid 40-140, air 7-40 | 1 MW - 8-12 months; 2-5 MW - 9-14 months in phases | commercial or AI data center on a greenfield site or at a host partner |
| Power blocks + conventional hall | from 2 MW | per design | any | 9-14 months in phases | a building or fast construction is available; factory-built electrical and cooling |
| Conventional data center | from 5 MW | per design | any | 18-30 months | long horizon; factory-built power modules shorten the timeline |
Values are typical for the product line as of 10.2026 and are refined in the project. Timelines are indicative, not a commitment, and depend on site readiness and grid connection.
Comparison
How the formats differ
| Parameter | Container | Micro-module | Prefabricated data center |
|---|---|---|---|
| Server room required | no, outdoor installation | yes, a hall with power | no, the modules form the building |
| Factory completeness | up to 90% | module is assembled in the hall | up to 90% |
| Climate | -40...+55 °C outdoors | per hall conditions | -40...+45 °C, margin for heat |
| Cooling | in-row air conditioners N+1 | air and liquid in one module | cooling plant, CDU, free cooling |
| Expansion | docking the next container | the next row | the next IT module and plant |
| Enclosure protection | IP55 or higher | per hall class | per design |
20 and 40 ft containerized data center
The entire data center in one enclosure: power, cooling, racks, fire suppression. Installation from 1 day.
Learn moreIn-building micro-module
A data center inside an existing hall: air and liquid in one module, row by row.
Learn morePrefabricated data center 1-5 MW
IT modules, a cooling plant and a power block form the data center building. 1 MW in 8-12 months.
Learn moreRequest
Tell us about your site
IT capacity and rack type, redundancy and autonomy requirements, location and climate, availability of a grid connection, target launch date. Within a week we will prepare a concept, an equipment list and a schedule.