Illustration: a set of OS Power prefabricated data center modules - IT module, power distribution module and cooling plant

Format

Prefabricated data center 1-5 MW

IT modules, a cooling plant and a power block are manufactured at the plant and assembled on site into a data center building. This is the base option for 1-5 MW commercial and AI data centers on a greenfield site or at a host partner.

Key figures

up to 90%

factory completeness of modules

manufacturer data

8-12 months

for a 1 MW site from contract signing to acceptance

OS Power calculation

up to 140 kW

per rack with liquid cooling

manufacturer data

What it consists of

IT module

Prefabricated enclosure 4.2-4.7 m wide with two rows of racks and 1,200 / 900 mm aisles, redundant in-row CDUs, distribution switchboards, busways, gas fire suppression, aspirating smoke detection, access control and monitoring.

Cooling plant

Adiabatic dry coolers or free-cooling chillers in N+1, variable-speed pumps, glycol circuit; supply at 30-40 °C, up to 45 °C without compressors for platforms that allow it.

Power block

6-35 kV switchgear, dry-type transformers, main switchboard with ATS, space for OS Power energy storage and a supercapacitor cabinet.

Generation and storage

N+1 or 2N gensets and energy storage on the site busbar: peak shaving, backup, delayed genset start.

Typical specifications

IT capacity
1-5 MW, in phases
Density
liquid 40-140 kW, air 7-40 kW per rack
IT module
4.2-4.7 m wide, 1,200 / 900 mm aisles
Cooling plant
1.3-1.5 MW per plant, N+1
Power block
6-35 kV input, dry-type transformers, main switchboard, ATS
PUE
1.15-1.3 design annual, depends on climate and liquid cooling share
Climate
-40...+45 °C, 20-25% heat exchanger margin for hot climates
Timeline
1 MW - 8-12 months; 2-5 MW - 9-14 months in phases

Specifications are typical for the product line as of 10.2026. PUE is a design annual value; timelines are indicative, not a commitment.

Applications

  • Commercial and AI data centers of 1-5 MW
  • Sites at a host partner with a ready grid connection
  • Campuses with phased growth
  • Data centers at the energy source: power plants, industrial sites

Three completeness modes

How much is built at the plant

The plant works in three modes: up to 90% factory completeness (the module arrives with equipment inside), about 70% (enclosure and engineering systems, equipment installed on site) and reconstruction of existing buildings with factory-built engineering blocks. We choose the mode based on logistics, dimensions and timelines.

Plant projects

Partner plant data as of 10.2026.

China, YangzhouTelecom operators

Yangtze River Delta data center

174 MW, 6 buildings

Customer
China Mobile
Result
engineering infrastructure, liquid cooling of AI halls; PUE down to 1.15; first three buildings in operation since March 2025; 10-year operation support

China, WuhuAI providers

Intelligent computing park

126 MW, 3 buildings of 42 MW

Customer
AI provider jointly with the city authorities
Result
about 2,770 racks in each building; project handed over

China, ZhongweiTelecom operators

Data center in Ningxia

72 MW, 2 buildings

Customer
China Mobile
Result
5,280 racks at 13.64 kW; accelerated commissioning

Projects

Request

Tell us about your site

IT capacity and rack type, redundancy and autonomy requirements, location and climate, availability of a grid connection, target launch date. Within a week we will prepare a concept, an equipment list and a schedule.