Documents
Documents for design and procurement
Datasheets, drawings, certificates and test reports for each model are available on request. For the calculation - a twelve-item questionnaire.
Package
What the document package includes
Package contents for designers and procurement.
| Document | Contents | When |
|---|---|---|
| Datasheet | energy, power, voltage, cycle life, temperature, dimensions, weight | immediately on request |
| Dimensional drawing | dimensions, connection points, foundation requirements | immediately on request |
| Single-line diagram | point of connection, protection, metering | at the design stage |
| Certificates | IEC 62619, IEC 63056, UN 38.3 and others by model | immediately on request |
| Test reports | factory tests, thermal runaway propagation tests | at the procurement stage |
| EAEU documents | conformity assessment, the applicant is the group's Russian company | with delivery |
| Operating manual | installation, commissioning, maintenance | with delivery |
Certificates
Certificates by model
- 115 kWh sodium cabinet
- IEC 62619, IEC 63056, GB/T 44265-2024
- LFP cabinets and containers
- list by model, in the datasheet
- 48 V modules
- list by model, in the datasheet
- EAEU
- conformity assessment under TR CU 004/2011 and 020/2011
The current list of certificates is sent together with the datasheet of the specific model.
Questionnaire
What is needed for an accurate calculation
The more complete the data, the more accurate the configuration and payback. You can start with the first five items.
- Peak and average load of the site, kW.
- Hourly consumption profile for a year (export from the metering system).
- Price category and tariffs under the power supply contract.
- Task: lower charges, backup, grid connection, on-site generation, grid-scale storage.
- Country, region and site climate, minimum winter temperature.
- Installation location: outdoors, indoors, rooftop; space and weight constraints.
- Existing solar plant or gensets.
- Voltage class and point of connection.
- Required backup time for critical loads.
- Requirements for communication with the dispatcher and the monitoring system.
- Fire safety and insurer requirements.
- Target commissioning date.
Request
Tell us about your site
Peak and average load, hourly load profile for a year (if available), tariff and price category, site climate and the task: lower electricity costs, backup, grid connection or on-site generation. We will reply with a configuration, an indicative payback and a lead time.