Documents

Documents for design and procurement

Datasheets, drawings, certificates and test reports for each model are available on request. For the calculation - a twelve-item questionnaire.

Package

What the document package includes

Package contents for designers and procurement.

DocumentContentsWhen
Datasheetenergy, power, voltage, cycle life, temperature, dimensions, weightimmediately on request
Dimensional drawingdimensions, connection points, foundation requirementsimmediately on request
Single-line diagrampoint of connection, protection, meteringat the design stage
CertificatesIEC 62619, IEC 63056, UN 38.3 and others by modelimmediately on request
Test reportsfactory tests, thermal runaway propagation testsat the procurement stage
EAEU documentsconformity assessment, the applicant is the group's Russian companywith delivery
Operating manualinstallation, commissioning, maintenancewith delivery

Certificates

Certificates by model

115 kWh sodium cabinet
IEC 62619, IEC 63056, GB/T 44265-2024
LFP cabinets and containers
list by model, in the datasheet
48 V modules
list by model, in the datasheet
EAEU
conformity assessment under TR CU 004/2011 and 020/2011

The current list of certificates is sent together with the datasheet of the specific model.

Safety

Questionnaire

What is needed for an accurate calculation

The more complete the data, the more accurate the configuration and payback. You can start with the first five items.

Get the questionnaire

  1. Peak and average load of the site, kW.
  2. Hourly consumption profile for a year (export from the metering system).
  3. Price category and tariffs under the power supply contract.
  4. Task: lower charges, backup, grid connection, on-site generation, grid-scale storage.
  5. Country, region and site climate, minimum winter temperature.
  6. Installation location: outdoors, indoors, rooftop; space and weight constraints.
  7. Existing solar plant or gensets.
  8. Voltage class and point of connection.
  9. Required backup time for critical loads.
  10. Requirements for communication with the dispatcher and the monitoring system.
  11. Fire safety and insurer requirements.
  12. Target commissioning date.

Request

Tell us about your site

Peak and average load, hourly load profile for a year (if available), tariff and price category, site climate and the task: lower electricity costs, backup, grid connection or on-site generation. We will reply with a configuration, an indicative payback and a lead time.

Add details: name, country, file

Prefer a messenger? Write to an engineer on Telegram or WhatsApp - we reply during business hours.

Request