Water treatment plant, 2,075 and 700 kVA
- Scope
- fuel day tanks of 1,000 and 2,500 l
- Result
- backup for a continuous process
Solution
100-3,000 kVA units with ATS, parallel operation and synchronization. For large sites - operation on an 11 kV bus; for critical loads - storage for uninterrupted transfer.
Key figures
6 × 3,000 kVA
at 11 kV with PLC synchronization, waste-to-energy plant
manufacturer data30-4,000 A
automatic transfer switches
manufacturer data110 %
load in factory testing of every unit
manufacturer dataStopping a furnace, pumping station or refrigeration costs more than a genset.
Several units in parallel, grid synchronization, medium voltage operation.
Ventilation, exhaust, noise and vibration isolation in an existing building.
Regular load starts and reports for the chief power engineer.
Solution
Gensets with ATS and synchronization, generator hall design or containerized design, storage for critical loads.
Storage eliminates the power interruption during transfer to gensets.
| Item | Scope |
|---|---|
| Generating sets | 100-3,000 kVA, open, enclosed or containerized |
| Controls | auto-start, synchronization and parallel operation controllers, PLC |
| Distribution | ATS 30-4,000 A, main switchboard, 11 kV operation via neutral grounding resistor |
| Fuel | fuel day tanks, double-wall tanks, automatic fuel transfer |
Parallel operation and synchronization are project-specific; controllers are selected for the site scheme.
See also: Lower capacity charges · Backup data center site
Manufacturer data. Details and references on request after approval by customers.
1-3 MVA units with data center rating, containerized power modules and fuel for 48-72 hours.
Learn more48 V DC gensets and solar hybrids: 40-60 % fuel savings.
Learn moreContainerized units and hybrid with storage: less fuel, fewer deliveries and engine hours.
Learn moreContainerized and trailer-mounted units while waiting for the grid, then site backup.
Learn moreThe genset runs less often and at efficient load: less fuel, fewer engine hours and site visits.
Learn moreRequest
Load and load profile, operating mode (backup or primary source), climate, grid availability, noise and fuel requirements. We will reply with a configuration, lead time and proposal.