Modular or conventional build

Modular data center or conventional build

The main difference is not price but time: modules are manufactured at the plant in parallel with site preparation, and the data center starts operating a year earlier. Estimate the timelines for your capacity.

Estimate

Timelines for your capacity

Modular data center
Conventional build

In operation earlier
months earlier the site starts generating revenue

    The estimate is indicative: timelines depend on the site, grid connection and permits. Market leaders report 35-60% shorter timelines compared with conventional construction.

    Comparison

    What else differs

    ParameterModular data centerConventional build
    Timeline for 1 MW8-12 months, 4-6 with power in place18-30 months
    Investmentin phases to match actual demandmostly upfront, for the target capacity
    Qualityfactory assembly and testingdepends on on-site contractors
    Expansionthe next module without downtimea new construction phase
    Relocationmodules can be moved to another sitenot possible
    Permitsoften simpler, modules are equipmentfull conventional construction cycle
    Service lifeenclosure and engineering systems for 20-25 yearsbuilding for 50 years or more

    Request

    Tell us about your site

    IT capacity and rack type, redundancy and autonomy requirements, location and climate, availability of a grid connection, target launch date. Within a week we will prepare a concept, an equipment list and a schedule.