Updated:
In Russia the capacity charge, the local equivalent of a demand charge, is paid by consumers in price categories 3 to 6 with a maximum capacity of 670 kW or more, and it is set by the site load during planned peak hours that the system operator publishes in advance. A peak shaving battery charges at night and discharges exactly in those hours, holding grid import below a set threshold. The result depends on the hourly load profile, the price category and how well discharge matches the planned peak window.
What the demand charge is in Russia
On the Russian retail electricity market a consumer chooses a price category. In categories 1 and 2 capacity is not billed separately: its cost is included in the energy price. From category 3 onward metering is hourly and the bill splits into an energy charge and a capacity charge. For consumers with a maximum capacity of 670 kW or more these categories are in practice mandatory.
Billed capacity is not the site maximum. It is the site load during planned peak hours that the system operator sets for every working day of the month, so a single bad hour inside that window sets the charge for the whole month. In categories 4 and 6 a separate network maintenance rate is billed as well, which increases the value of peak reduction.
| Price category | Metering | Capacity charge | Network maintenance rate |
|---|---|---|---|
| 1 and 2 | integral or by time of day | included in energy price | included in energy price |
| 3 | hourly | yes | included in single-rate transmission tariff |
| 4 | hourly | yes | billed separately |
| 5 | hourly with consumption planning | yes | included in single-rate transmission tariff |
| 6 | hourly with consumption planning | yes | billed separately |
Demand charge reduction with battery storage
The battery management system knows the planned peak hours and discharges in that window, keeping grid import below a target threshold. Production runs as usual while the meter records lower capacity. The operating modes are described on the peak shaving and demand charge page.
Two kinds of peaks should not be confused. The site peak is the facility own maximum load, for example when equipment starts. The system operator planned hours are the window in which billed capacity is measured, and they do not always coincide with the site peak. Only discharge in the planned hours cuts the capacity charge; shaving the site own peaks helps when the facility hits a contractual or transformer capacity limit.
- Night: the battery charges at the night tariff, the load runs on the grid.
- Planned peak hours: discharge keeps grid import below the threshold.
- Sudden load rise: the battery picks up equipment starts within fractions of a second.
- Grid outage: island mode for critical lines until the grid returns or a genset starts.
Load shifting and other value streams
Capacity charge reduction is the main value stream, but not the only one. The battery also shifts load: it charges in cheap night hours and supplies energy in expensive daytime zones. The wider the time-of-day price spread, the larger this effect.
The battery also carries critical load through short voltage dips that a genset cannot catch, works with on-site solar, and lets a site avoid waiting for grid reinforcement where spare capacity is not available. Backup value is calculated separately, based on the cost of downtime for the specific operation. Payment for primary frequency regulation is not included: as of 10.2026 there is none in Russia.
Data needed for a peak shaving study
An accurate study uses an hourly consumption profile for 12 months. A single month does not show seasonality and does not reveal how often the site peak coincides with the system operator planned hours. The export can usually be obtained from the metering system or the energy retailer.
- Hourly consumption profile for one year.
- Peak and average site load, kW.
- Price category and tariffs under the supply contract.
- Objective: bill reduction, backup, grid connection, own generation.
- Region, site climate and minimum winter temperature.
- Installation location and limits on area and weight.
Sizing power and energy
Battery power is set by how many kilowatts of grid import must be removed in the planned hours. Energy is set by the length of the planned peak window and the depth of reduction, with margins for usable depth of discharge, round-trip efficiency and battery ageing over the study period. Sizing covers every working day of the year, not one average day.
Mid-size plants are typically served by cabinets combined in groups, large sites by containers. The full range is in the cabinet and container line-up.
| Format | Energy | Power | Typical sites |
|---|---|---|---|
| 261 kWh liquid-cooled cabinet | 261 kWh | 125 kW | daily cycling, cabinet groups at mid-size plants |
| 5.0 MWh container | 5,016 kWh | 2.5 MW | large consumers and grid projects |
What drives peak shaving payback in Russia and Central Asia
In a sample calculation for a 2.5 MW / 5 MWh system in Russia, simple payback is about 3 years in price categories 4 and 6 and 4.2 years in category 5; discounted payback is 3.8 and 7.6 years respectively. This is an example as of 10.2026, not a commercial offer. The difference between categories comes from the network maintenance rate.
You can estimate your own site in the battery economics calculator: it runs in the browser, and the default tariffs should be replaced with your own.
- Price category: the effect is higher in categories 4 and 6.
- Share of capacity charge reduction: 50 % for a first estimate, 30 to 70 % range in the calculator.
- Profile shape: a steady daytime load gives a more predictable result.
- Time-of-day tariff spread for load shifting.
- Climate: heating in frost consumes part of the energy.
- Maintenance and battery ageing over the study period.
Kazakhstan and Uzbekistan
In Kazakhstan the battery business case is based on the site contract with the energy supplier, which defines how capacity is paid. For sites in the north and centre of the country, where winter reaches -40 °C, heating or NFPP sodium chemistry is a standard requirement.
In Uzbekistan time-of-day tariffs apply from 22.09.2026 to consumers of 750 kVA and above, so load shifting becomes a source of income. Long summer outages add backup value. A behind-the-meter battery does not require a separate licence. More on the Russia, Kazakhstan and Uzbekistan markets page.
Questions and answers
What is the demand charge in Russia?
It is the capacity charge paid by consumers in price categories 3 to 6. It is calculated from site load in the planned peak hours set by the system operator.
How does a peak shaving battery reduce the demand charge?
It charges at night and discharges in the planned peak hours, keeping grid import below a threshold. Production schedules do not need to change.
Is the site peak the same as billed capacity?
No. The site peak is the facility own maximum load. Billed capacity is measured only in the system operator planned hours, so the two values can differ.
What data is needed for a battery study?
A 12-month hourly profile, price category, contract tariffs, site objective and climate. You can start with the first items of the questionnaire.
What payback can a peak shaving battery reach?
It depends on profile, category and tariffs. In a sample calculation as of 10.2026 for a 2.5 MW / 5 MWh system, simple payback is about 3 years in categories 4 and 6 and 4.2 years in category 5.