Russia

City rooftop: a cabinet instead of a shelter

Large city, residential rooftop, cold climate. Mobile operator, network densification programme of 50 sites.

Before

An 8 m² rooftop shelter with an air conditioner and lead-acid batteries. Rent keeps rising, the owner will not approve expansion, every new site takes 3-6 months.

Solution

  • All-weather 750 × 750 mm cabinet on a frame instead of the shelter
  • Power system with up to 98 % efficiency, compressor and heat pipe cooling
  • 4 hours of backup on 48 V modules

Inputs

Sites
50
Load, kW
3
Climate
Cold
Backup, h
4
Outages per year
20
Tariff per kWh
8 RUB
Tariff growth per year
9 %

Result per site

502 k RUBsaving per site per year251 m RUBacross all sites over 10 years
Conventional siteOS Power cabinet
Energy per year, kWh34,35828,200
Energy reduction-17.9 %
Footprint8 m²2 m²
Inspection visits per year122
Site rollout120 days3 days
Batteries20 12 V batteries3 48 V modules
Battery replacements in 10 years20
Electricity over 10 years4.2 m RUB3.4 m RUB
Rent over 10 years2.4 m RUB600 k RUB
Visits over 10 years1.8 m RUB300 k RUB
Batteries over 10 years1.2 m RUB259 k RUB
Total over 10 years9.6 m RUB4.6 m RUB

NFPP: no battery heating in winter, backup holds even with climate control off.

498 k RUBsaving per site per year249 m RUBacross all sites over 10 years
Conventional siteOS Power cabinet
Energy per year, kWh34,35829,100
Energy reduction-15.3 %
Footprint8 m²2 m²
Inspection visits per year122
Site rollout120 days3 days
Batteries20 12 V batteries3 48 V modules
Battery replacements in 10 years20
Electricity over 10 years4.2 m RUB3.5 m RUB
Rent over 10 years2.4 m RUB600 k RUB
Visits over 10 years1.8 m RUB300 k RUB
Batteries over 10 years1.2 m RUB187 k RUB
Total over 10 years9.6 m RUB4.6 m RUB

LFP: cheaper modules, but the battery compartment needs heating to charge in winter.

Open in the calculator with your own figures

Kazakhstan

Steppe at -40 °C: backup without heating

Roadside site, northern region, frost down to -40 °C. Mobile operator, replacing lead-acid at 120 sites.

Before

A heated container with lead-acid batteries. Lead loses capacity in winter, outages are frequent, the site is hours away, batteries get stolen.

Solution

  • All-weather 750 × 750 mm cabinet on a base
  • Sodium NFPP modules: discharge at -40 °C without heating
  • Battery lock, gyroscope and GPS, remote test

Inputs

Sites
120
Load, kW
2
Climate
Cold
Backup, h
4
Outages per year
50
Tariff per kWh
40 KZT
Tariff growth per year
10 %

Result per site

2.1 m KZTsaving per site per year2.46 bn KZTacross all sites over 10 years
Conventional siteOS Power cabinet
Energy per year, kWh23,50618,863
Energy reduction-19.8 %
Footprint8 m²2 m²
Inspection visits per year122
Site rollout120 days3 days
Batteries16 12 V batteries2 48 V modules
Battery replacements in 10 years20
Electricity over 10 years15 m KZT12 m KZT
Rent over 10 years7.7 m KZT1.9 m KZT
Visits over 10 years9.2 m KZT1.5 m KZT
Batteries over 10 years5 m KZT907 k KZT
Total over 10 years36.9 m KZT16.4 m KZT

NFPP: in frost during an outage the backup runs without heating - the main argument for the steppe.

2 m KZTsaving per site per year2.42 bn KZTacross all sites over 10 years
Conventional siteOS Power cabinet
Energy per year, kWh23,50619,763
Energy reduction-15.9 %
Footprint8 m²2 m²
Inspection visits per year122
Site rollout120 days3 days
Batteries16 12 V batteries2 48 V modules
Battery replacements in 10 years20
Electricity over 10 years15 m KZT12.6 m KZT
Rent over 10 years7.7 m KZT1.9 m KZT
Visits over 10 years9.2 m KZT1.5 m KZT
Batteries over 10 years5 m KZT655 k KZT
Total over 10 years36.9 m KZT16.7 m KZT

LFP: cheaper to buy, but below -20 °C it does not discharge without heating, which goes off with the grid.

Open in the calculator with your own figures

Uzbekistan

A three-operator site in the heat

Suburb, up to +45 °C in summer, 8-10 hour outages. Tower company, 40 sites with three tenants.

Before

A single-operator shelter plus extensions for two more: 16 m², three air conditioners, lead-acid replaced every 2-3 years, summer outages drain the backup.

Solution

  • Row of three 900 × 1,200 mm multi-service cabinets with shared cooling
  • Own load groups and 6 hours of backup per operator
  • Generator and solar inputs in the power system

Inputs

Sites
40
Load, kW
6
Operators per site
3
Climate
Warm with hot summers
Backup, h
6
Outages per year
120
Tariff per kWh
1,100 UZS
Tariff growth per year
10 %

Result per site

118 m UZSsaving per site per year47.06 bn UZSacross all sites over 10 years
Conventional siteOS Power cabinet
Energy per year, kWh71,72458,146
Energy reduction-18.9 %
Footprint16 m²6 m²
Inspection visits per year122
Site rollout120 days3 days
Batteries60 12 V batteries9 48 V modules
Battery replacements in 10 years30
Electricity over 10 years1.26 bn UZS1.02 bn UZS
Rent over 10 years384 m UZS144 m UZS
Visits over 10 years234 m UZS38 m UZS
Batteries over 10 years600 m UZS97.2 m UZS
Total over 10 years2.48 bn UZS1.3 bn UZS

NFPP: up to +60 °C without separate battery cooling, 8,000+ cycles with daily outages.

120 m UZSsaving per site per year48.14 bn UZSacross all sites over 10 years
Conventional siteOS Power cabinet
Energy per year, kWh71,72458,146
Energy reduction-18.9 %
Footprint16 m²6 m²
Inspection visits per year122
Site rollout120 days3 days
Batteries60 12 V batteries9 48 V modules
Battery replacements in 10 years30
Electricity over 10 years1.26 bn UZS1.02 bn UZS
Rent over 10 years384 m UZS144 m UZS
Visits over 10 years234 m UZS38 m UZS
Batteries over 10 years600 m UZS70.2 m UZS
Total over 10 years2.48 bn UZS1.27 bn UZS

LFP: cheaper to buy, shorter life in heat, needs cabinet climate control.

Open in the calculator with your own figures

Manufacturer sites

One site before and after

Old equipment and air conditioners leave the site, and a row of cabinets with shared cooling stands on the same base.

Before: the base after removal of old equipment
Before: the base after removal of old equipment
After: a row of integrated cabinets
After: a row of integrated cabinets

Where these cabinets already work

Cabinets, power systems and cooling from the group’s manufacturing partner at operator sites in China.

Row of three cabinets at a new mountain site
New siteGuangdong Province, China6 BBUs, 2 transmission units; 3 cabinets, 6U power system, 6 lithium modules, 10 + 6 kW cooling
Cabinets at an upgraded mountain-top site
Mountain-top upgradeZhejiang Province, China3 BBUs, 96-fibre patch frame; 2 cabinets, 6U power system, 2 lithium modules, 10 + 6 kW cooling
Cabinet installation on site
Dense park siteJiangsu Province, China19 BBUs, 2 transmission units; 3 cabinets, 6U power system, 8 lithium modules, 10 + 6 kW cooling

Calculation: OS Power calculator method; prices and tariffs are country assumptions you can replace in the calculator. Sites in China - manufacturer data.

Request

Tell us about your sites

Number of sites, type (rooftop, ground, pole), climate, equipment load, how many operators share the site and what is installed today. We will reply with a cabinet configuration and pilot terms.

Add details: name, country, file

Prefer a messenger? Write to an engineer on Telegram or WhatsApp - we reply during business hours.

Request